Electroplating Equipment's & Plants

Home - electroplating equipment's & plants

ELECTROPLATING EQUIPMENT & PLANTS :

  • design as per the needs & requirements
  • manufacturing, assembly, supply & prove out at site
  • ms or ss fabricated gate & cantilever type transport
  • pvc or cpvc, pvdf & pp fabricated immersion tank
  • scada & plc based control panels
  • ons-site support during installations
  • continuously provide high quality service
  • detachable structural arrangement
  • equipment & plants with exhaust system & scrubbers

NEW BLACKENING LINE: (3D GA)

  • line consists of 14tanks
  • total line length 13m
  • ss tanks made of ss316 &ss304 with lpg gas burner heating system
  • pph tanks with water overflow system – roechling make
  • ss316l moc tanks for special blackening chemical
  • new ss316l transporter with flight bars
  • new chimney for fumes exhaust
  • lpg gas burner for ss316l tanks for heating with gas line piping
  • new 30hp capacity scrubber & system. the new scrubber system connected to existing & new line
  • control panel with 10’’ hmi & burner controllers
  • plc programming with scada integration
  • smart plc programming for transporter.
  • CLIENT: M/S INDO MIM. BANGALORE
product-img
product-img product-img product-img product-img product-img product-img product-img product-img product-img

ANODISING LINE

  • line consists of 32 tanks
  • total line length 35m
  • modification of whole line for ele. wiring, piping & walkway
  • new detachable type structures
  • new plc programming with scada. report generation from scada for rectifier current output vs time
  • smart programming for transporters.
  • recipes & combinations plc programming
  • modification & rectification of header duct connections
  • busbar routing and installations
  • CLIENT: M/S INDO MIM. BANGALORE
product-img
product-img

HARD CHROME LINE

  • line consists of 12tanks
  • total line length 15m
  • modification of whole line for ele. wiring, piping & walkway
  • new detachable type structures
  • modification of existing transporter
  • modification hader duct and connections
  • CLIENT: M/S INDO MIM. BANGALORE

TRANSPORTER FOR EXISTING BLACKENING LINE

  • new transporter as per the customer requirements
  • ss316l material of construction
  • uhmw wheels and track rollers
  • sew make motors and drive
  • installation, field wiring & routing
  • lifting height – 1000mm
  • lifting capacity 150kg
  • CLIENT: M/S INDO MIM. BANGALORE
product-img